Horizon School

Basketball Nets

Horizon School

NWS was asked by one of our clients in Horizon School in Barnsley to supply and install 4 Basketball Systems.

What we did

Here we have our 4 day installation period of the basketball hoops from scratch - including excavation, concrete setting and then finally the full insertion and furnishing of the basketball posts.

Day 1

The work was carried out in the half term holidays to avoid any disruption to the school.

3 4m x 1m holes were excavated on day 1 to allow installation of the sockets.

The sockets were installed with ready-mixed concrete. 

The sockets were then left for 3 days to allow the concrete to cure

Day 4

On return to site we insterted the posts into the sockets.

We then proceeded to hand the basket furniture and top the re-instate the holes.

The customer was over the moon that everything had gone smoothly, on time and no mess.