NWS was asked by one of our clients in Horizon School in Barnsley to supply and install 4 Basketball Systems.
What we did
Here we have our 4 day installation period of the basketball hoops from scratch - including excavation, concrete setting and then finally the full insertion and furnishing of the basketball posts.
Day 1
The work was carried out in the half term holidays to avoid any disruption to the school.
3 4m x 1m holes were excavated on day 1 to allow installation of the sockets.
The sockets were installed with ready-mixed concrete.
The sockets were then left for 3 days to allow the concrete to cure
Day 4
On return to site we insterted the posts into the sockets.
We then proceeded to hand the basket furniture and top the re-instate the holes.
The customer was over the moon that everything had gone smoothly, on time and no mess.